 |
RFPs, RFQs, or IFBs |
 |
Doing Business
RFPs, RFQs, or IFBs
Call for Projects
Awarded Contracts
Rail Station Vendors
Property
Employer Services
::
|
| RFPs | Issued | Due | | (1) Request for Qualifications 10-31-079-00 for the Construction Management Services, Materials Testing, and Construction Surveying of the I-215 Widening, Murrieta Hot Springs Road to Scott Road, in the city of Murrieta, California | 2/22/2010 | 3/25/2010 2:00 p.m. | | (2) INVITATION FOR BIDS (IFB)/AGREEMENT NO. 10-31-030-00 FOR CONSTRUCTION OF THE SR-74 AND I-215 INTERCHANGE PROJECT, IN RIVERSIDE COUNTY, IN THE CITY OF PERRIS, CALIFORNIA | 2/18/2010 | 3/30/2010 2:00 p.m. | | (3) Request for Proposals 10-45-059-00 for Freeway Service Patrol Beats No. 1 & 26 | 1/25/2010 | 2/22/2010 2:00 p.m. | | (4) Request for Qualifications 10-31-058-00 for Construction Management of the Perris Valley Line Metrolink Improvement Project | 1/14/2010 | 3/25/2010 2:00 p.m. | | (5) Request for Proposals 10-51-048-00 for On-call Right of Way Appraisal Services | 12/23/2009 | 1/26/2010 2:00 p.m. | | (6) Request for Proposals 10-51-051-00 for On-call Right of Way Appraisal Review Services | 12/23/2009 | 1/26/2010 2:00 p.m. | | (7) Request for Qualifications 10-33-031-00 for Environmental Document Preparation, Preliminary Engineering, Final Engineering Design and Construction Support Services for the Riverside Downtown Metrolink Layover Facility in Riverside, CA | 11/20/2009 | 12/22/2009 2:00 p.m. | | (8) Request for Proposals to Provide Property Maintenance and Repair Services on an On-Call Basis for Commission-Owned Properties Located Throughout Western Riverside County, and as described more fully in the attached Statement of Work | 10/29/2009 | 12/2/2009 2:00 p.m. | | (9) Request for Qualifications for the Establishment of a Pre-Qualified, Ranked List of Up to 3 Consultant Teams to Provide Engineering and Environmental Services Required for the Preparation of Separate Project Reports, Environmental Documents and Possible Final Design for Proposed Improvements to State Highways in Western Riverside County | 8/24/2009 | 9/24/2009 2:00 p.m. | | (10) Request for Qualifications 09-31-080-00 for Construction Management Services, Materials Testing, and Construction Surveying for the Construction of the SR-74 / I-215 Interchange Improvement Project | 6/12/2009 | 7/14/2009 2:00 p.m. |
|
|